Burlington Northern Employee Timetables

Phase 0 Timetables issued May 10 1968, the original merger date that was stayed by court order.  It contains timetables issued for the CB&Q, GN, NP, & SPS territory in divisional format, but not including the Colorado & Southern and Fort Worth & Denver territory, as these railroads remained separate corporate entities.  Special instructions were issued as separate publications.  These timetables are from Dean Ogle’s collection, scanned by Dean.
Phase 1 Timetables that were issued on Mar 03, 1970.  It contains timetables issued for the CB&Q, GN, NP, & SPS territory in divisional format, but not including the Colorado & Southern and Fort Worth & Denver territory, as these railroads remained separate corporate entities.  Special instructions were issued as separate publications.
Phase 2 Timetables published after the initial Mar 3, 1970 issue in regional format.  These include the Chicago, Twin Cities, Billings, Omaha-Denver, Portland, Seattle, Portland-Seattle and Seattle-Portland.  Special instructions were issued as separate publications.  C&S and FW&D still remained separate corporate entities.
Phase 3 Timetables issued beginning 10/31/82 or 04/24/83.  They represented the final regional format in effect in 1982, but now had the special instructions incorporated into the same publication.  They contained common special instructions usually placed at the front of the timetable.  Rarities include two Ft Worth Region timetables that covered the Ft Worth Division only.  This was consolidated into the Denver Region Oct 30, 1983.
Phase 4 Represents the divisional re-organization that occurred October 20, 1988.  Among some of the differences were BN Green color front and back covers and a colored signal page 2 of timetables issued after #1.
Phase 5 Represents an attempt at paper publication reduction by creating 3 corridors, Northern, Central and Southern.  They were issued Jan 1, 1993 and were a one time issue.
Phase 6 Represents the introduction of the looseleafs in a binder format.  It potentially allowed correction of individual pages, however it appears that rather than replace pages BN management simply issued a new set of system looseleafs three times before BNSF merger.

 

Dean Ogle has scanned several CMStP&P / BN joint timetables covering the trackage operated jointly between St. Croix Tower and Division Street in Minnesota. These mostly cover the dates of Phase 2, but a few late ones are into Phase 3.  Click here for the entire set.

Ted Pope has scanned several SP timetables that BN used for trains running on trackage rights between Klamath Falls and Chemult in Oregon.  They date between March 23, 1969 and October 30, 1977.  Click here for the entire set.

This page last updated on 3/20/2015.